Please use this identifier to cite or link to this item: http://repository.iiitd.edu.in/xmlui/handle/123456789/679
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPrakash, Divay
dc.contributor.authorKumar, Hemant (Advisor)
dc.date.accessioned2018-09-25T07:45:07Z
dc.date.available2018-09-25T07:45:07Z
dc.date.issued2017-04-18
dc.identifier.urihttp://repository.iiitd.edu.in/xmlui/handle/123456789/679
dc.description.abstractThe building management HVAC(heating, ventilation and air conditioning) system for Phase II of IIIT-Delhi campus is designed to take care (and advantage) of diversity of use. Instead of using large AHUs(Air Handling Units), we will have individual units in faculty rooms, labs, and other spaces. This would allow us to condition air of the spaces that are occupied and the system would be able to maintain desired temperature more closely. The disadvantage of this approach is higher capital cost and a larger I/O points for BMS but the running cost will be saved. In this project we are developing a scheduler hosted on a web server to control the ACs valves connected through Raspberry Pi and Arduino.en_US
dc.language.isoen_USen_US
dc.publisherIIIT-Delhien_US
dc.subjectBuilding management systemen_US
dc.subjectScheduleren_US
dc.subjectWeb serveren_US
dc.titleBuilding management system extensionen_US
dc.typeOtheren_US
Appears in Collections:Year-2018

Files in This Item:
File Description SizeFormat 
Divay Prakash_2014039.pdf
  Restricted Access
1.12 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.